
Migrating to AWS GovCloud: A Step-by-Step Playbook
Last updated: October 2026
How do you migrate to AWS GovCloud? You set up a GovCloud account, build a compliant landing zone before any data moves, prove the process with a low-risk pilot, then migrate CUI workloads in waves and decommission what you leave behind. Done well, the move can shrink your CMMC assessment scope, but only if the old systems are actually retired and your System Security Plan (SSP) reflects the new boundary. This six-phase playbook reflects the approach VSO uses with Defense Industrial Base clients.

Moving to AWS GovCloud (US) is one of the most effective ways for a defense contractor to consolidate CUI into a controlled environment. Migrations go sideways when teams treat them as a standard lift-and-shift. The order of operations matters as much as the technology.
Where CMMC stands in 2026: On July 13, 2026, the Department of War suspended CMMC Phase 2, pausing third-party (C3PAO) assessment requirements in new contracts. DFARS 252.204-7012, the 110 requirements of NIST SP 800-171 Rev 2, self-assessments, SPRS scores, and annual affirmations all still apply, and primes can still require CMMC Level 2 certification. A well-planned migration still makes all of that easier to meet and prove.
Before You Start: Getting a GovCloud Account
GovCloud is a separate AWS partition. You request a GovCloud account through a standard AWS account, which handles billing, and the GovCloud account gets its own credentials, IAM, and resources. Resources can’t be shared between commercial AWS and GovCloud, so plan to rebuild rather than extend what you have.
To qualify, your organization must be a U.S. entity, and the account holder must be a U.S. person. If you’ll handle export-controlled data, plan your access controls around ITAR from the start. Also check two things early:
- Region: GovCloud has two regions, US-West and US-East. See our guide to AWS GovCloud regions for how to choose a primary and a disaster recovery region.
- Cost: GovCloud is usually priced higher than commercial regions. See our AWS GovCloud pricing guide before you build the budget.
Phase 1: Discovery and Scope Definition
Before anything moves, identify every system that handles CUI, the applications it depends on, how data flows between them, and every external provider that connects to the CUI environment, including MSPs, SaaS tools, and security tools. Confirm the services you need are available in GovCloud, since not every commercial AWS service is.
The output is a migration scope document and a current-state CMMC assessment scope map. Both feed the architecture design and your updated SSP. Our guide to CMMC scoping covers what counts as in scope.
Phase 2: Architecture Design and Landing Zone
Build the landing zone before the first workload moves:
- A multi-account structure for production, dev/test, logging, and security tooling
- VPC segmentation that separates CUI and non-CUI workloads
- Centralized identity with AWS IAM Identity Center and enforced multi-factor authentication
- A security and evidence stack such as AWS CloudTrail, AWS Config, AWS Security Hub, Amazon GuardDuty, and AWS KMS for FIPS-validated encryption
Configure logging and monitoring before workloads arrive. Retrofitting them later is harder and leaves gaps in your audit trail.
Phase 3: Pilot Migration
Pick a non-critical workload for the pilot, such as a dev environment, a backup system, or an internal tool. The goal isn’t to move the most important system first. It’s to prove your landing zone, tooling, and runbooks work.
The pilot also starts your SSP documentation: a description of the migrated system, the requirements it supports, and evidence that your security stack is capturing what it should.
Phase 4: Production CUI Workload Migration
Migrate in waves: low-dependency applications first, then more complex integrations, then core CUI systems last. Each workload goes through pre-migration validation, cutover (redirect traffic, update DNS, disable the old path), post-migration validation, and a compliance check. Keep data encrypted in transit and at rest the entire time.
AWS offers migration services built for this work. Confirm each one is available in your GovCloud region before you plan around it.
| AWS service | What it moves | Typical use |
|---|---|---|
| AWS Application Migration Service | Servers (physical, virtual, or cloud) | Rehosting on-premises or commercial AWS servers into GovCloud with minimal downtime |
| AWS Database Migration Service | Databases | Moving SQL Server, Oracle, MySQL, PostgreSQL, and other databases, including ongoing replication until cutover |
| AWS DataSync | Files and object data | Moving file shares and storage into Amazon S3, EFS, or FSx with encryption in transit |
| AWS Direct Connect or Site-to-Site VPN | Network connectivity | Private, encrypted connections between your facilities and GovCloud during and after migration |
Phase 5: Decommission On-Premises Scope
Scope reduction isn’t automatic. The systems you migrated away from have to be retired, and no CUI can remain on them. That means documented media sanitization under NIST SP 800-171 Rev 2 requirement 3.8.3, an updated SSP, and a revised network diagram showing the new assessment boundary.
Phase 6: Steady-State Operations and Continuous Monitoring
Migration complete doesn’t mean compliance complete. You still need configuration management, patching, continuous monitoring, log review, and periodic control validation to keep meeting the 110 requirements of NIST SP 800-171 Rev 2.
VSO is an AWS Advanced Tier Partner and supports DoD clients in AWS GovCloud at both IL4 and IL5. If your program requires an impact level, see our guide to IL4 vs IL5. We scope exactly what you ask for: some customers want us to run their GovCloud environment day to day, and others want it built right and handed back to their own team.
VSO manages GovCloud migrations and ongoing operations for defense contractors. Learn more about our cloud services, or contact us today at sales@vso-inc.com to start with a migration readiness review.






